dailynewshungary.com
Hungarian FM: It is a realistic goal to build Paks II by 2030
Some sections of the sixth block will be up to 23 metres deep to ensure the block’s stability and safety, Péter Szijjártó said, adding that 30-40 trucks are being used to dump the soil being dug up.
#Paks #PéterSzijjártó